SC42 Sliding roof inner & outer complete material
Inner and outer material sections of the sliding roof as fitted to the SC42
The roof is made to order - around a 4 week lead time at present.
(does not include battens)
The roof is made to order - around a 4 week lead time at present.
(does not include battens)
SC42ZCOUPEROOF
Product Code
New
Product Condition
Updating Order Details
Please do not refresh or navigate away from the page!
Details
Reviews
Featured Products
VHF Coax Cable RG58 1 m
£1.99
A screened RF cable having a stranded core 17/0.19mm tinned copper conductor with a solid polyethylene...
glass door hinge matt n..
£21.60
Pair Glass door hinges in matt nickel used in the heads SC29 S29 OEM Sealine
Trim Tab Plate 240, S24..
£186.00
Trim tab plate to fit 240, S24, S23, S25 fitted with Eltrim trim tabs. Also fits other older models -...
BEP 710 VSR -140amp Vol..
£42.00
Currently unavailable - please enquire. The DVSR (Digital Voltage Sensing Relay) allows charging of two...
Anti-Rattle Mortise Lat..
£28.20
Anti-Rattle Mortise Latch S/S various models. OEM Sealine
A
110mm
B
15mm
...